Excavation SWMS template
Trenching and excavation including service location and ground support.
A cubic metre of soil weighs about 1.5 tonnes, and a trench wall lets go without warning. Excavation deeper than 1.5 metres is its own high risk construction work category, and most excavation jobs trigger a second one — powered mobile plant — before the first bucket hits the ground.
This template covers trenching and excavation for services and footings: locating what is already in the ground, digging with plant around workers on foot, ground support, and getting people in and out of the trench safely.
What this SWMS covers
The typical scope of work the document describes, step by step. The builder lets you add, remove and reword steps so the sequence matches your actual job.
- 1Site set up and traffic management
- 2Locate underground services
- 3Excavate trench
- 4Support the excavation (batter, bench or shore)
- 5Install services or drainage
- 6Backfill and compact
- 7Restore surface
Hazards and example controls
The controls below are starting points ordered by the hierarchy of control — the builder helps you adapt them to the site and add your own.
Trench collapse burying workers
- Batter, bench or shore any excavation people enter beyond 1.5 m
- Keep spoil and plant back from the trench edge (zone of influence)
- Competent person inspects ground support daily and after rain
Striking underground services
- Obtain Before You Dig Australia plans before any excavation
- Pothole by hand or vacuum to positively locate services
- Treat every unidentified service as live until proven otherwise
Plant striking workers on foot
- Exclusion zone around operating plant; one spotter controls entry
- Positive communication between operator and ground crew
- High-visibility clothing for everyone inside the work zone
Falls into the excavation
- Barricade open excavations, especially overnight
- Provide ladder access — no climbing trench walls or shoring
High risk construction work
- Excavation deeper than 1.5 metres
- Work involving powered mobile plant
Excavation deeper than 1.5 metres is a named category, and using an excavator adds the powered mobile plant category. Digging near live services can also bring in the energised-electrical or pressurised-gas categories — the service location step is what tells you which ones apply on this site.
All 18 high-risk categories explainedCommon questions
- Does a 1.2 metre trench need a SWMS?
- The excavation category starts at 1.5 metres — but the job can still require a SWMS through other categories: mobile plant, work near roads, or work near underground services that are energised or pressurised. Check the whole job, not just the depth.
- Are Before You Dig plans enough to start digging?
- No. The plans show what should be there, at roughly the marked alignment. You must positively locate services by potholing before mechanical excavation near them — plans are step one, not clearance.
- When does an excavation need shoring versus battering?
- That is a call for a competent person based on soil type, depth, water and vibration. The SWMS should record which method was chosen and why, and require re-inspection after rain or nearby plant movement — ground conditions change mid-job.
Build your civil SWMS now
Start from this template and answer a few questions about the job — state, site, crew, method. Preview the whole document free; pay only when you download the PDF.